Warning | Plan Ahead: Check for Schedule Updates

We’ve made some service adjustments that may affect your route. Please check the latest schedule before traveling to see if your trip is affected.

Learn more Trip Planner

Information | Teleride: Technical Issues

At this time, we are aware that customers may be experiencing repeat schedule information on Teleride (403-974-4000). You can also use Teletext (text 74000 - msg & data rates may apply), download the Transit app, or use the Trip Planner on our website for scheduling information. We apologize for any inconvenience this may cause. Thank you for your patience as we work to resolve this issue as quickly as possible.

Sunnyside Pedestrian Crossings: Enhanced for Safety and Accessibility

Photo of the newly upgraded Sunnyside station crossing

The Sunnyside Pedestrian Crossings upgrades are now complete, with the new gates officially in service as of July 27, 2025. These enhancements are part of our commitment to improving how customers move through Calgary Transit spaces—making them safer, easier to navigate, and more inclusive.

What’s New?

The Sunnyside crossings have been upgraded with several improvements, including:

  • Automatic gate arms to help manage pedestrian flow
  • Emergency swing gates for added protection
  • Wider crossing surfaces for smoother movement
  • Tactile surfaces and wheelchair ramps to support accessibility
  • Cane-detectable features to assist visually impaired pedestrians
  • LED indicators and upgraded lighting for better visibility
  • Modern control systems for improved reliability
  • Enhanced CCTV coverage to support safety

Preparing the Area

Before installation, several changes were made to get the crossings ready:

  • Community feedback helped shape the final design—thanks to public input, the existing canopies were kept and the design was adapted around them
  • Relocation and adjustment of equipment like train lights, signals, and snow removal sheds
  • Widening of crossings with new planks for smoother access
  • Demolition and repositioning of stairs and fencing to make space for the new layout

These upgrades are designed to improve safety and accessibility for all CTrain customers. Thank you for your patience during construction.

South Crossing BEFORE

North Crossing BEFORE

CTrain crossing before update

4 Ave NW Crossing BEFORE

CTrain crossing before updates

South Crossing AFTER

North Crossing AFTER

photo of new Sunnyside Station crossing improvements

4 Ave NW Crossing AFTER

photo of new Sunnyside Station improvements as a train passes by

Categories: untitled